Mar 2---Mar 6 Yuzhou is one Coal Mine Railway to Pingdingshan East Station. The line is 52.5km. QJ 6786, 7186, 6656 in steam. 
QJ 6786 is working in Yuzhou.
During March 4---6 Pingdingshan coal mine area There are 7 diesels working in Pingdingshan coal mine, but all JS ,SY still running.

SY 1209 bring passenger from Fanzhuang drive to Eight Mine at 9:20 on 5 Mar.

At 9:40 JS 8630 bring special empty coal train drive to Four Mine and pusher is JS 8030 on 6 Mar.

At noon JS 8122 bring some coal wagons from Nine Mine to Baofeng on 6 Mar.
  
The local people is working near by No 2 mine.

Local people is wait for passenger at No 13 mine on March 5.
Mar 10---19 Fuxin: Even overseas open casting coal mine was closed, but still have 12 SY in steam.SY 1319, 0540, 1396, 88, 1397, 1320, 1210, 1378 in Wulong Station.

Wulong coal mine station,March 10

Wulong coal mine station,March 10

Wulong coal mine station,March 10
Aiyou Mine: SY 1195 is working on 10 Mar.

Qinghanmen Station: SY 1460 is working on 10 Mar.
Beipiao: SY 0387, 1004 in steam, SY 1451 in workshop.

At 16:11 by SY 0387 bring coal train from Sanbao Mine drive back Guanshan on 10 Mar.
 
SY 1004 and SY 0387 Luotuoyengzi Cement Factory QJ 6671 stop in yard on 11 Mar.

Nanpiao: SY 0366, 0973,1299, 9754 in steam.

SY 1029 was repaired at workshop(photo) on 11 Mar.

At 7:02 SY 0973 bring passenger left Shaguotun on 12 Mar.

SY 0754 bring passenger from Huangjia go into Xiamiao Station at 14:53 on 12 Mar
Huludao:JS 6243, 6307, 8207 in steam.SY 0513 , 1415 is cold loco.

Gradient was very big, so must put some sands on the rail and can claim up to the top.

JS 6243 bring freight train drive to Yangjiazhangzi at 9:50 0n 14 Mar.
Lingyuan Steel Mail SY 1708(Tongling SY) 1096, 0724 in steam.
 
During 15:00---16:00 SY 1096 and Tongling SY 1708 from factory one by one come to shed and load coal, get water on March15.
Pingzhuang Coal mine Group: Open Casting Coal Mine SY 1425, 1052, 1079, 0210 in steam, SY 0463 is dead loco. 
SY 1083, 1084 stop at workshop on Mar 16.
JS 1001, 5758 are broken loco in store. Pingmei Co Company Maintain Dep:

Cold Loco in yard: JS 8216, 6544, 8246, 6246, 8218(March 16)

SY 1425, 1487, 0517, 0400 were repairing on Mar 16.
  
SY 1085,1764, 1025, 0942, 0788, 0943 in steam.( Mar 16)
Yuanbaoshan Coal mine railway:

JS 8249 is cold and JS 8250 in steam on March 17.
Hongmiao Mine:

SY 1418 in steam (photo) on 17 Mar.SY 1565 in workshop on March 17.
Chengde Steel Factory (Chenggang): SY 1522, 0532, 0048 in steam. 
0533 just was repaired and stop at store on March 18..

Broken Loco is 0099. JS 6368, 1726, 1029, 0872 on 18 Mar.
Shuangtashan Shed(March 18) : Cold loco 1639, 1753, 1422.
26 Mar---30 Mar Jixi ,Hegang coal mine railway:

Jixi's Lishu Mine: By SY 0951 bring special empty train go to No Seven Mine on 26 Mar.

Chengzihe Nanchang(March 27)
Hengshan coal mine :

By SY 1344+0341(pusher) bring special empty coal train from Xinzhan drive to Zhongxin Zhan at 9:20 on Mar 28.
Didao Mine:

At 15:50 by SY 1213 bring special coal steam train from power plant back to Didao Transfer Dep on 27 Mar.
Hegang Coal mine railway :

At 7:30 by SY 1498 bring passenger from Fuli go to Jipei on 29 Mar

1370 , 1038, 1685 in workshop(March 29) and worker is working.
Changchun SY 3023, 3024,0683 was dead on 29 Mar.
China steam Railway could be bigger change in 2007, but I will put it on my website on time when I know it.
|